BESCOM : Bangalore Electricity Supply Company Limited

SMS: 9243150000
Helpline: 1912

BESCOM Common SR 2012-13

Adoption of Bescom Common SR 2012-13 dated on 31.10.2013

PDF FILE1 Preface, Index, Part – 1: Rates of line Materials & Labour charges, Cost Data Sheet from 1 to 34
PDF FILE2 a.) Cost Data Sheet from 35 to 49,
b.)Part:2 Schedule of rates for standard stock materials – 11KV system from SL No:1 to 693
PDF FILE3 a.) Schedule of rates for standard stock materials (11KV system) from SL No:687 to 719,
9 b.) Bill of materials from 1 to 14,
c.) Part:3 Schedule of rates for labour 2012-13 from SL No 1 to 10
PDF FILE4 Schedule of rates for labour 2012-13 from SL No 11 to 25
PDF FILE5 a.) Schedule of rates for labour 2012-13 from SL No 26 to 30,
b.) Part 4 Schedule of rates for standard stock materials (33KV system) from SL No: 1.1 to 17.4
PDF FILE6 a.) Part 5 Schedule of rates for labour 2012-13 (33KV system) from SL No: 1 to 48,
b.) Part 6 special locality allowance,
c.) Scale of inspection fees of electrical inspectorate from scale A & B
PDF FILE7 a.) Part 8 Scale of inspectionfees of electrical inspectorate from scale C to ZD,
b.) Part 9 Drawings & Circulars
PDF FILE8 a.) Circulars,
b.) Details of Special Design Transformers